Project schedule

Sun    Mon      Tue     Wed    Thu     Fir     Sat
                                       9         10        11      12
13       14          15        16        17        18       19
20       21          22        23        24        25       26
27       28          29        30        31          1         2
  3         4            5          6          7          8         9


Project check points

Preproduction 
  1. Brand-Cheap Monday and theme - Nature, back staircase (9/5)
  2. Concept and ideas generation(12/5) 
  3. sketches and draft (14/5)
  4. materials(14/5)
  5. lightings(14/5)
A clear draft to illustrate the look of window display (14/5)
includes:
  • dressing 
  • position of mannequins
  • lighting 
  • materials
Production 
  1. materials needs (props, prints or somethings) 
  2. preparation of materials (buy, handmade, print)
  3. production plan (how, procedure to set up) 
Window display production (27/5)


Project presentation(4/6)

  • an outline / structure of ppt (21/5)
  • fill in the ppt 22-30/5


  1. ppt done (1/6)
  2. presentation strategy  (1/6)
  3. rehearsal (1/6)
if we have time also prepare the report including layout and printing. 